In order to enhance the safety guarantee capacity of vehicle operation and improve the emergency response level of employees in case of sudden vehicle malfunctions, Wuxi Jushen recently organized a special emergency drill for vehicle tire blowouts. This drill was carried out in the company's cargo yard, with participants including fleet drivers, safety management personnel and relevant logistics support staff.
At the beginning of the drill, the company gave a concise and clear drill mobilization, elaborating on the purpose, process and significant meaning of this drill, and clearly dividing the responsibilities of personnel in each link. At the same time, cases of vehicle tire blowouts that occurred in other units in the past were analyzed, sounding the safety alarm for the drill participants and also enabling everyone to have a deeper understanding of the necessity of the drill.

Upon receiving the report, the dispatching room immediately activated the emergency response plan and issued instructions to the emergency rescue team. The emergency rescue team promptly carried maintenance tools to the scene, evaluated the condition of the vehicle, and then carried out the tire replacement operation in an orderly manner. Throughout the entire rescue process, each team worked closely together, communicated smoothly, and strictly followed the emergency response plan procedures, demonstrating a high level of emergency response capabilities.
After the drill was over, General Manager Zeng of the company made a comprehensive summary and comment on this drill. He pointed out that this drill achieved the expected results. When facing the sudden tire blowout, the driver operated in a standardized manner and responded promptly. Each emergency rescue team responded in a timely manner and collaborated efficiently, fully testing the scientific nature and operability of the company's emergency plan. Meanwhile, in response to some detailed issues identified during the drill, such as the insufficient proficiency of individual personnel in using the tools and the potential for further optimization in the connection of certain links, improvement measures were proposed.